Planning Blog: Location, Participants, Health, Schedule

 









In Lucas's house, in a city alley, and in a restaurant. 

 
 

Participants 

Actors 

Lucas Alves 

Christan St. Rose 

Filming 

Daniel Arroyo 

Editing 

Lucas Alves 

Christan St. Rose 

Daniel Arroyo 

Directing 

Daniel Arroyo 

 
 

 
 

Health 

For our safety, we are going to have a med kit near us at all times to be equipped with basic medical supplies to address minor injuries or illnesses. Avoid anything that can lead to one of us getting hurt. Use reliable equipment and safety checks are performed before each use. Safety measures considerations for weather conditions, terrain, and other environmental factors that could affect the well-being of the cast and crew. Have an adult on set to make sure we don't get into anything wrong. 

 
 

Schedule 

1/28 - 2/9 The filming is going to begin and finish when we get all the necessary shots and angles that we need by then. 

2/14 - 2/21 Around this time we are going to edit and get everything done within this time frame. 

 

Comments

Popular posts from this blog

CCR Part 1

CCR Part 2

Production Blog